"How long until our website is ready?" is one of the first questions clients ask us — right after the question about price. The short answer is "it depends," but the longer answer is far more useful, because it shows exactly what affects the timeline and what you can shorten yourself.
Not every website is the same kind of project, so the time it takes varies significantly:
| Website type | Typical timeline | What extends it |
|---|---|---|
| Brochure / simple presentation site | 1–2 weeks | Rarely much — usually waiting on text content |
| Custom company website (5–20 pages) | 2–3 weeks | Content scope, number of feedback rounds |
| Online store with product import | 3–5 weeks | Payment setup, categories, XML feed configuration |
| Website with custom functionality (calculators, bookings) | 5–8 weeks | Testing functionality, integrating with external systems |
These figures apply from the moment content and materials are approved — not from when the contract is signed. That distinction is exactly why estimates sometimes don't match reality.
Surprisingly, it's rarely technical complexity. Most delays come down to three things:
1. Slow delivery of materials. Text, photos, logos, and access to the domain or existing hosting — if we're waiting on these mid-project, work stalls for exactly as long as they're missing. A business with content ready in advance typically saves a week or two compared to one supplying it piecemeal.
2. Scattered feedback. When several people send design feedback separately with conflicting opinions, a single revision round can turn into four. A clearly designated point of contact who consolidates feedback into one list solves this almost entirely.
3. Unclear scope at the start. "Actually, could we also add..." partway through development is the most common reason timelines slip — not because we couldn't handle it, but because the brief itself is changing. That's why we lock down scope during the proposal stage, before development begins.
Yes, under clearly defined conditions. If you need a website urgently (say, ahead of a trade show or a new service launch), it helps to:
For a simple brochure site with content already prepared, we can realistically go under a week. For an online store or a site with custom functionality, there's a physical floor on how much testing time can be compressed — and that's not a place where cutting corners pays off.
Do I pay upfront or after delivery? We typically split payment into a deposit before work starts and a balance after launch — exact terms are part of the quote.
What if I don't like the design after the first draft? The first round of feedback is a normal part of the process and comes at no extra cost — the point of the first draft is precisely to find the right direction together.
Can I edit the website myself afterwards? Yes. You'll get admin access after delivery. If you don't have the time or inclination to edit content yourself, we can take care of it as part of our content management service.
What determines a website's timeline is mainly project scope and how quickly materials and feedback come in — not technical difficulty. If your content is ready and you can clearly state what the website needs to achieve, most standard projects take 2 to 3 weeks.